Caso de proyecto

project case

Hubei # phosphate mine, KJ311 rock drilling jumbo equipped with the WOSERLD M13B/D rock drill

Tiempo de liberación: 2023-05-23
Hubei phosphate mine, section 5×5 meters, KJ311 rock drilling jumbo equipped with the WOSERLD M13B/D rock drill. The drilling depth per hole is 3.4 meters, with an average drilling time of 1 minute and 30 seconds. The entire section requires 54 holes, taking 3 hours to complete.

× ¿Cómo puedo ayudarte?