Caso de proyecto

project case

Dandong Iron Mine, , uses a tunneling drill rig equipped with the WOSERLD A18D/L hydraulic rock drill

Tiempo de liberación: 2023-11-07
Dandong Iron Mine, with a cross-section of 4.5×5 meters, uses a tunneling drill rig equipped with the WOSERLD A18D/L hydraulic rock drill. The hole depth is 3.4 meters, with an average drilling time of 2 minutes per hole.

× ¿Cómo puedo ayudarte?