Caso de proyecto

project case

Shandong Gold Mine, , uses a bolting rig equipped with the independently developed WOSERLD W14B/D hydraulic rock drill.

Tiempo de liberación: 2023-11-09
Shandong Gold Mine, with a cross-section of 4.3×4.3 meters, uses a bolting rig equipped with the independently developed WOSERLD W14B/D hydraulic rock drill. The drill rod length is 2.475 meters, and the average time per hole is 45 seconds.

× ¿Cómo puedo ayudarte?