Caso de proyecto

project case

Henan gold mine, utilizes a mini hydraulic mining drill rig equipped with the WOSERLD A18D/L hydraulic rock drill

Tiempo de liberación: 2023-02-23
Henan gold mine, section 3*3 meters, utilizes a mini hydraulic mining drill rig equipped with the WOSERLD A18D/L hydraulic rock drill. The borehole diameter is 65mm, drill rod length is 0.915 meters, with an average drilling time of 35 seconds per hole.

× ¿Cómo puedo ayudarte?